Journal Articles
Ayinla, K, Cheung, F, Towe, B (2025)
Time-driven activity-based costing (TDABC) model for performance optimization of offsite manufacturing methods housebuilding,
Construction Management and Economics, pp.1-20, ISSN: 0144-6193. DOI:
10.1080/01446193.2025.2492850.
Yevu, S, Blay, K,
Ayinla, K, Hadjidemetriou, G (2025)
Artificial Intelligence in offsite and modular construction research,
Automation in Construction, 171(2025), 105994, ISSN: 0926-5805. DOI:
10.1016/j.autcon.2025.105994.
Seidu, RD,
Ayinla, K, Shady, A, Young, BE, Ofori, G, Ebohon, OJ (2022)
Success Factors in Mega Infrastructure Projects (MIPs): Developing Nations Perspectives,
IOP Conference Series: Earth and Environmental Science, 1101(4), pp.042015-042015, ISSN: 1755-1307. DOI:
10.1088/1755-1315/1101/4/042015.
Seidu, RD, Young, BE, Stanton, C, Momoh, J,
Ayinla, K (2022)
The differing approaches to sustainability between practising and academic Quantity Surveyors,
International Journal of Construction Supply Chain Management, 12(1), pp.1-29, DOI:
10.14424/ijcscm120122-1-29.
Ayinla, K, Cheung, F, Skitmore, M (2022)
Process Waste Analysis for Offsite Production Methods for House Construction: A Case Study of Factory Wall Panel Production,
Journal of Construction Engineering and Management, 148(1), ISSN: 0733-9364. DOI:
10.1061/(asce)co.1943-7862.0002219.
Ayinla, KO, Cheung, F, Tawil, A-R (2019)
Demystifying the concept of offsite manufacturing method,
Construction Innovation, 20(2), pp.223-246, ISSN: 1471-4175. DOI:
10.1108/ci-07-2019-0064.
Ayinla, KO and Adamu, Z (2018)
Bridging the digital divide gap in BIM technology adoption,
Engineering, Construction and Architectural Management, 25(10), pp.1398-1416, ISSN: 0969-9988. DOI:
10.1108/ecam-05-2017-0091.